Friday, September 2, 2016
August Accomplishments
In August, I wanted to:
1. Get two quilts (Joe and Daniel's graduation quilts) to the longarmer. I need to get the red flannel backing ironed and squared up first. Halfway done. I got one of them to the longarmer, but it isn't back yet. I need to sew strips to my flannel backing for the other quilt. This time it wasn't all my fault. The measurements on the pattern were off by 10 inches on the finished quilt top. But I was too lazy to get the quilt out and measure, so I relied on the pattern and bought backing that was slightly too small.
2. Bind Julianna's graduation quilt. DONE!
3. Finish Needle Guardian Stitching. This is an easy goal. Maybe I can start the finishing too. DONE and FINISHED!!
4. Start Scream House finishing. If I don't start the finishing soon, it won't be done for Halloween this year. Completed all the backstitching around the pieces.
5. Work on Talkin' Turkey. I have 30 more blocks to make. I'd like to finish 15 of them. DONE! Fifteen more blocks complete.
6. Get the borders on Jamestown landing. Maybe even get it to the longarmer! Completely done, bound, and will be gifted tonight! Very happy with this quilt!
7. Keep up with RSC. Done! Purple was the color this month.
I haven't really thought through my goals for September other than that I am feeling time pressure on Scream House and really need to finish it soon. I usually start Halloween decorating in September, so I want it done soon and on display.
Subscribe to:
Post Comments (Atom)
1 comment:
You did amazing in August. I need to get my butt in gear and finish some more of my UFO's. I'm so close to be done some of them. I really just have to do it. LOL and not think about it.
Post a Comment