In July, I wanted to:
1. Get paper removed from Jamestown Landing string blocks. DONE thanks to my sister and niece.
2. Continue RSC. The color is hot pink this month, so I'll probably just make a few blocks. I don't have much in the way of hot pink scraps. DONE. Nineteen blocks complete!
3. Complete broken dishes units for Jamestown Landing. DONE And I go the whole center together too.
4. Chose at least one quilt top and get it to a longarmer. Two would be better! DONE. Just got one there, but it is already quilted.
5. Finish Needle Guardian stitching. Almost done. I need to finish backstitching the lining.
6. Start Scream House finishing. Would like to get the pieces all backstitched, but that may be a stretch.
Didn't start the backstitching, but I pulled out the finishing instructions and read them.
7. Work on Talkin' Turkey. A little bit done. I cut some red and white pieces to make flying geese units.
In August, I would like to:
1. Get two quilts (Joe and Daniel's graduation quilts) to the longarmer. I need to get the red flannel backing ironed and squared up first.
2. Bind Julianna's graduation quilt.
3. Finish Needle Guardian Stitching. This is an easy goal. Maybe I can start the finishing too.
4. Start Scream House finishing. If I don't start the finishing soon, it won't be done for Halloween this year.
5. Work on Talkin' Turkey. I have 30 more blocks to make. I'd like to finish 15 of them.
6. Get the borders on Jamestown landing. Maybe even get it to the longarmer!
7. Keep up with RSC.