I have 257 four patches complete.
I have 50 more sewn, but they still need to be pressed. I just got tired of standing up, so I'll do them tomorrow. Some of my oranges lean toward coral or gold, but it was raining all day yesterday and today too, and I didn't feel like going to the quilt shop, so I used them.
This is all the orange fabric I have left.
I have a few decent sized pieces to cut strips from, but a lot of my orange is trash scraps: crumpled up, odd shades of orange and/or too small to use. If there is more orange in this quilt, I will need to buy more.
To see more Celtic Solstice progress: http://quiltville.blogspot.com/2013/12/mystery-monday-link-up-part-4.html
Monday, December 23, 2013
Thursday, December 19, 2013
Celtic Solstice Caught Up
I completed my pinwheels for Celtic Solstice just 5 minutes ago, so I am caught up with the clues for about another 10 hours. Then the next clue comes out, and all bets are off! This is a hard time of year to drop it all and sew.
I was supposed to make 61 of these, but I got carried away and made 75. Someday I'm going to make a kitchen sink quilt and these extra pinwheels will be in that quilt. I like the orange and yellow combination!
I was supposed to make 61 of these, but I got carried away and made 75. Someday I'm going to make a kitchen sink quilt and these extra pinwheels will be in that quilt. I like the orange and yellow combination!
Tuesday, December 17, 2013
Reflections on Quilting Resolutions for 2013
I played along with Sandy at Quilting for the Rest of Us and made some quilting resolutions last year for 2013.
She asked what each of us wanted to accomplish.
1. One Block Wonder Quilt: The top is done.
2. Kathryn's graduation quilt: Done, quilted and gifted!
3. Using more stash than I buy. As of last Sunday, here's where I stand. I didn't succeed here.
Used this week: 2.5 yards
Used Year to Date: 91.125 yards
Added this week: 1.5 yards
Added year to date: 100.625 yards
Net Added: 9.5 yards
BUT I made 3 quilts using only scraps in my stash:
She asked what each of us wanted to learn. I said:
I want to learn how to paper piece well. (And I want to learn to like paper piecing)
Mission accomplished in learning to paper piece well. The Harry Potter quilt was a crash course in paper piecing. I found that I do like to paper piece too!
She asked what I want to experience through quilting. I said:
I want to experience 'green' quilting. I want to make a quilt from recycled clothing or some other kind of repurposed fabric. I want to be more mindful of waste in my quilting and waste in other aspects of my life.
In response to this goal, I made 3 quilt tops out of men's shirts. I really enjoyed this process and plan to make more recycled fabric quilts in the future.
My guiding word for my quilting life in 2013: focus. I feel like I did focus on my quilting in 2013. Maybe my word for 2014 should be 'balance'. With all the quilting, I didn't have time to get the cross stitching and knitting done that I wanted to in 2013. But overall, I am pleased that I met most of my goals. Linking up with Patchwork Times: http://www.patchworktimes.com/2013/12/31/get-it-done/
Monday, December 16, 2013
Celtic Solstice, Behind Already
I finished step 2 this weekend. Step 3 was released last Friday, so I'm already officially behind.
Several times while I was working on this step, I found myself wondering if I really wanted to make the king sized version or do the small one. The small version only needs 100 chevron units. The king size needs 244. I persevered and made 250. I like to have extras just in case I miscount or have a quality control issue.
Several times while I was working on this step, I found myself wondering if I really wanted to make the king sized version or do the small one. The small version only needs 100 chevron units. The king size needs 244. I persevered and made 250. I like to have extras just in case I miscount or have a quality control issue.
I am glad I bought those extra yellow fat quarters early this fall, or I wouldn't have had enough to do this step. I may have to go out and buy a few more, but I'm hoping I have enough.
Step 3 looks easier than the first 2. Maybe I can catch up this week. To see more CS progress:
Saturday, December 14, 2013
Stash Report
I finished one pillowcase and 9 rice bags this week. I think my Christmas sewing is done.
Used this week: 2.5 yards
Used Year to Date: 91.125 yards
Added this week: 1.5 yards
Added year to date: 100.625 yards
Net Added: 9.5 yards
To see more stash reports: http://www.patchworktimes.com/2013/12/15/stash-report-week-50-2013/
Friday, December 13, 2013
Celtic Solstice, Step 3
I sighed with relief when I saw step 3 of Celtic Solstice: half square triangles! A unit I can make easily and accurately. I'm still working on step 2. I thought I was done, but then I realized I was ONE HUNDRED units short. I worked last night on it, but I still have a long way to go.
I'm also working on rice bags for a friend's family for Christmas. They all need one, including the two boyfriends, so I've got 9 rice bags to make plus one pillow case, 4 dozen cookies for the cookie exchange and 3-4 batches of caramel corn for the neighbors.
My oldest son graduates this week from college too. He isn't interested in attending the ceremony. I am not sure if they even have a ceremony for kids who graduate in December. After 5 1/2 years of college, I am just ready for him to graduate. He has amassed 225 1/5 credits ( instead of the usual 120 credits needed to graduate). So if anyone is looking for an over-educated mechanical engineer with math minor, and a BIS in set design and technical theater, email me! He would love to work as an Imagineer at Disney but realizes his first job might not be his dream job.
I'm also working on rice bags for a friend's family for Christmas. They all need one, including the two boyfriends, so I've got 9 rice bags to make plus one pillow case, 4 dozen cookies for the cookie exchange and 3-4 batches of caramel corn for the neighbors.
My oldest son graduates this week from college too. He isn't interested in attending the ceremony. I am not sure if they even have a ceremony for kids who graduate in December. After 5 1/2 years of college, I am just ready for him to graduate. He has amassed 225 1/5 credits ( instead of the usual 120 credits needed to graduate). So if anyone is looking for an over-educated mechanical engineer with math minor, and a BIS in set design and technical theater, email me! He would love to work as an Imagineer at Disney but realizes his first job might not be his dream job.
Monday, December 9, 2013
Celtic Solstice, Sweet Potato Pie
I've made a big dent in Celtic Solstice, Part 2. Almost all my uphill units are done as well as about 1/3 of my down hills. I put one unit all the way together to make sure everything would line up and nest well. I think I could have finished the whole step this weekend, but I wanted to spend a bit of time with my DH and son.
I also took time to make a sweet potato pie with pecan pie topping this weekend. YUM! This recipe is a keeper!
Sweet Potato Pie with Pecan Pie Topping
Topping:
1 egg
3 Tbsp. dark corn syrup
3 Tbsp. brown sugar
1 Tbsp. butter, melted
1 tsp. maple flavoring
1 cup chopped pecans
Pie:
2 medium sweet potatoes, baked, pealed and kept warm
1/4 cup butter
1 14 oz. can fat-free sweetened condensed milk
1 tsp. vanilla extract
1 tsp. each cinnamon, nutmeg, grated orange zest
1/4 tsp. salt
2 eggs
1 9-inch pie crust (The recipe didn't say to do this, but I pre-baked my pie shell, so it wouldn't get soggy. Worked great!)
Preheat oven to 350 degrees.
Topping: Combine egg, corn syrup, brown sugar, melted butter and maple flavoring. Mix well. Add pecans and set aside.
Pie: In large mixing bowl, beat warm sweet potatoes with butter until smooth. Add condensed milk, vanilla, cinnamon, nutmeg, orange zest, salt and eggs. Mix well. Pour into pastry shell. Bake 30 minutes.
Remove from oven and spoon topping carefully over the pie. Bake an additional 20-25 minutes or until golden brown. Serve warm.
Here is my pile of waste triangles. Bonnie said they would be good for her pineapple paper pieced quilt, but I have no plans to make that one, so if you want them, let me know
To see more Celtic Solstice progress: http://quiltville.blogspot.com/2013/12/celtic-solstice-mystery-monday-link-up.html
I also took time to make a sweet potato pie with pecan pie topping this weekend. YUM! This recipe is a keeper!
Sweet Potato Pie with Pecan Pie Topping
Topping:
1 egg
3 Tbsp. dark corn syrup
3 Tbsp. brown sugar
1 Tbsp. butter, melted
1 tsp. maple flavoring
1 cup chopped pecans
Pie:
2 medium sweet potatoes, baked, pealed and kept warm
1/4 cup butter
1 14 oz. can fat-free sweetened condensed milk
1 tsp. vanilla extract
1 tsp. each cinnamon, nutmeg, grated orange zest
1/4 tsp. salt
2 eggs
1 9-inch pie crust (The recipe didn't say to do this, but I pre-baked my pie shell, so it wouldn't get soggy. Worked great!)
Preheat oven to 350 degrees.
Topping: Combine egg, corn syrup, brown sugar, melted butter and maple flavoring. Mix well. Add pecans and set aside.
Pie: In large mixing bowl, beat warm sweet potatoes with butter until smooth. Add condensed milk, vanilla, cinnamon, nutmeg, orange zest, salt and eggs. Mix well. Pour into pastry shell. Bake 30 minutes.
Remove from oven and spoon topping carefully over the pie. Bake an additional 20-25 minutes or until golden brown. Serve warm.
Subscribe to:
Posts (Atom)

