Saturday, December 14, 2013

Stash Report


I finished one pillowcase and 9 rice bags this week.  I think my Christmas sewing is done. 

 

Used this week: 2.5 yards
Used Year to Date:  91.125 yards
Added this week: 1.5 yards
Added year to date:  100.625 yards
Net Added:  9.5 yards

To see more stash reports: http://www.patchworktimes.com/2013/12/15/stash-report-week-50-2013/

Friday, December 13, 2013

Celtic Solstice, Step 3

I sighed with relief when I saw step 3 of Celtic Solstice:  half square triangles!  A unit I can make easily and accurately.  I'm still working on step 2.  I thought I was done, but then I realized I was ONE HUNDRED units short. I worked last night on it, but I still have a long way to go.

I'm also working on rice bags for a friend's family for Christmas.  They all need one, including the two boyfriends, so I've got 9 rice bags to make plus one pillow case, 4 dozen cookies for the cookie exchange and 3-4 batches of caramel corn for the neighbors. 

My oldest son graduates this week from college too.  He isn't interested in attending the ceremony.  I am not sure if they even have a ceremony for kids who graduate in December.  After 5 1/2 years of college, I am  just ready for him to graduate.  He has amassed 225 1/5 credits ( instead of the usual 120 credits needed to graduate). So if anyone is looking for an over-educated mechanical engineer with math minor,  and a BIS in set design and technical theater, email me!  He would love to work as an Imagineer at Disney but realizes his first job might not be his dream job.



Monday, December 9, 2013

Celtic Solstice, Sweet Potato Pie

I've made a big dent in Celtic Solstice, Part 2.  Almost all my uphill units are done as well as about 1/3 of my down hills.  I put one unit all the way together to make sure everything would line up and nest well.  I think I could have finished the whole step this weekend, but I wanted to spend a bit of time with my DH and son.

 
Here is my pile of waste triangles.  Bonnie said they would be good for her pineapple paper pieced quilt, but I have no plans to make that one, so if you want them, let me know

 

 I also took time to make a sweet potato pie with pecan pie topping this weekend.  YUM!  This recipe is a keeper!



Sweet Potato Pie with Pecan Pie Topping

Topping:
1 egg
3 Tbsp. dark corn syrup
3 Tbsp. brown sugar
1 Tbsp. butter, melted
1 tsp. maple flavoring
1 cup chopped pecans

Pie:
2 medium sweet potatoes, baked, pealed and kept warm
1/4 cup butter
1 14 oz. can fat-free sweetened condensed milk
1 tsp. vanilla extract
1 tsp. each cinnamon, nutmeg, grated orange zest
1/4 tsp. salt
2 eggs

1 9-inch pie crust  (The recipe didn't say to do this, but I pre-baked my pie shell, so it wouldn't get soggy.  Worked great!)

Preheat oven to 350 degrees.

Topping: Combine egg, corn syrup, brown sugar, melted butter and maple flavoring.  Mix well.  Add pecans and set aside.

Pie:  In large mixing bowl, beat warm sweet potatoes with butter until smooth.  Add condensed milk, vanilla, cinnamon, nutmeg, orange zest, salt and eggs. Mix well.  Pour into pastry shell. Bake 30 minutes.

Remove from oven and spoon topping carefully over the pie.  Bake an additional 20-25 minutes or until golden brown. Serve warm.

Sunday, December 8, 2013

Stash Report

My LQS was having a fat quarter sale (10 for $15).  The plan was to go with a friend, and we would each buy 5 FQs since neither of us really NEEDED more fabric.  I ended up buying 15 FQs instead of 5.  I was low on yellows, oranges and pinks, so  got a few of them.  Then I got several neutrals and greens for my Celtic Solstice and finally 3 purples because I really liked them. 

Earlier in the week, I also bought fabric for one more pillow case.  I know I'll finish this one soon because it is a Christmas gift.

Used this week: 0 yards
Used Year to Date:  88.625 yards
Added this week: 5.25 yards
Added year to date:  99.125 yards
Net Added:  10.5 yards

The bad news is I only see my self using 1-1.5 yards before the end of December, so I don't anticipate reaching my goal of using more than I added this year. I have 2 mystery scrap quilts in the works, though, and a one block wonder cut out and ready to sew.  I should have some quick finishes in 2014.  To see more stash reports:
http://www.patchworktimes.com/

Wednesday, December 4, 2013

Celtic Solstice: Part 1 Complete!

I am thrilled to have finally completed part 1 of Celtic Solstice.  I had forgotten how long each step of a Bonnie Hunter mystery takes.   I made 240 blue/white units and 140 blue/orange units because I'm making the king sized quilt.

 
I'm very happy with the quality of my units.  I have used the Tri-Recs tool before, and was not happy that many of the block I made with this tool were a little warped, not quite square.  This wasn't the fault of the tool but of my technique.  For Celtic Solstice, I used Deb Tucker's V-Block ruler instead of Tri-Recs.  With this ruler, the blocks are made a little over-sized and then trimmed down. In my mind, this extra step was worth the time.
 
 
I've also completed the next step in Scrapitude, but I need to trim the dog ears.
 
 
 

Monday, December 2, 2013

Celtic Solstice, Part 1

I've worked on Celtic Solstice this weekend.  All of my part one pieces are cut.  I am using Deb Tucker's V-Block ruler for this step.  I've used the Tri Recs in the past, and I haven't been happy with my accuracy using it.  The V-Block ruler is very forgiving in your cutting and sewing, but you have to trim down at the end. I am willing to do that trimming for the sake of accuracy.

Here's a real life picture of my blocks in progress.  It looks chaotic, but I have a system.



 Some of my blocks are sewn but not trimmed.

 
I should have most of these units complete by the time the next clue comes out, but I do have a little bit of Christmas sewing to do too.
 

Monday, November 25, 2013

Christmas Pillowcases and Stash Report

I made 5 pillowcases this weekend.  Three of them are early Christmas gifts for college kids.  I like to send them something while they are studying for exams.  I also made two for my BIL.  They match the quilt I made him for his birthday, and they use the same 3-D fabric.

 

 Used this week: 6.125 yards
Used Year to Date:  88.625 yards
Added this week: 7.25 yards
Added year to date:  93.875 yards
Net Added:  5.25 yards